Structural Analysis

Scaftec provide calculations to substantiate every design. This can range from hand calculations (to check the feasibility of a proposal) to fully computer-produced calculations (to accompany working drawings).
For larger or more complex designs (such as temporary roofs and/or large, free-standing, sheeted scaffolds) the frame analysis packages S-Frame and Scia Engineer are used:
Calculations for larger jobs are also produced using Microsoft Excel, and with bespoke software developed for specific jobs and clients. This allows for a consistency of presentation that meets the requirements of demanding clients.
All calculations are produced in accordance with the relevant regulations, guides and codes of practice:

  Regulations

  • Working at Height Regulations 2005
  • Construction (Design and Management) Regulations 2007

 

  British & European Standards

  • BS 2482:2009 (Specification for timber scaffold boards)
  • BS 1139 (Metal Scaffolding)
  • BS EN 74 (Couplers, spigot pins and baseplates for use in falsework and scaffolds)
  • BS EN 1004:2004 (Mobile access and working towers made of prefabricated elements)
  • BS 5974:2010 (Planning, design, setting up and use of temporary suspended access equipment)
  • BS 5975:2008 (Temporary works procedures and the permissible stress design of falsework)
  • BS EN 1999-1-1:2007 (Design of aluminium structures -General structural rules)
  • BS EN 39:2001 (Loose steel tubes for tube and coupler scaffolds)
  • BS EN 13374:2013 (Temporary edge protection systems – Product specification, test methods
  • BS EN 1990:2002 (Basis of Structural Design)
  • BS EN 1991-1-1:2002 (Actions on structures)
  • BS EN 1991-1-3:2003 (Loading for buildings – snow loads)
  • BS EN 1991-1-4:2005 (Loading for buildings – wind loads)
  • BS EN 12810-1:2003(Façade scaffolds made of prefabricated components – Products specifications)
  • BS EN 12810-2:2003 (Façade scaffolds made of prefabricated components -Particular methods of structural design)
  • BS EN 12811-1:2003 (Temporary works – Performance requirements and general design)
  • BS EN 12812:2008 (Falsework. Performance requirements and general design)
  • BS EN 1808:1999 (Safety requirements on suspended access equipment)
  • BS EN 1993-1-1:2005 (Design of steel structures)

  Guides

  • TG20:08 (NASC Guide to Good Practice for tube & fittings scaffolds)
  • TG4:11 (Anchoring systems for scaffolding)
  • SG4:10 (Fall Arrest Equipment Whilst Erecting, Altering & Dismantling Scaffolding)
  • TGN(E)190 (Design and use of Temporary Scaffolds Guards)
Posted in Our Services
Contact
Scaftec Ltd.
8 Lonmay Place
Panorama Business Village
Queenslie
Glasgow
G33 4ER
Scotland
United Kingdom
Phone   +44 (0) 141 771 4400
Email      info@scaftec.co.uk